Loading...

Residential Design, City Permit, Engineering & PTO / NEM

Explore our tailored service options below and choose the ideal plan for your requirements.

Permit Design
Up to 12 kW
$125.00

Ideal for standard residential rooftop solar installations.

  • First 2 correction free
  • $25 / correction after
  • 24-48 hr delivery
Permit Design
12 to 25 kW
$200.00

Best suited for large residential or multi-array setups.

  • First 2 correction free
  • $25 / correction after
  • 24-48 hr delivery
Permit Design
Over 25 kW
$300.00

Comprehensive packages for high-capacity residential systems.

  • First 2 correction free
  • $25 / correction after
  • 24-48 hr delivery

Engineering Stamps Category
Structural Stamp
Up to 15 kW
$175.00

Residential structural engineering stamp.

  • Restamp fee: $25
  • Fast engineering delivery
Structural Stamp
Over 15 kW
$300.00

Large residential structural engineering stamp.

  • Restamp fee: $25
  • Fast engineering delivery
Electrical Stamp
Up to 15 kW
$175.00

Residential electrical engineering stamp.

  • Restamp fee: $25
  • Fast engineering delivery
Electrical Stamp
Over 15 kW
$300.00

Large residential electrical engineering stamp.

  • Restamp fee: $25
  • Fast engineering delivery

City Permits & Interconnection Category
City Permit
Up to 10 kW
$250.00

City permit application.

  • City fees not included
City Permit
Over 10 kW
$350.00

City permit application.

  • City fees not included
PTO / NEM
Up to 10 kW
$250.00

PTO / NEM interconnection application.

  • NEM fees not included
PTO / NEM
Over 10 kW
$350.00

PTO / NEM interconnection application.

  • NEM fees not included
TEXAS SOLAR PERMIT DESIGN

Texas Solar Permit Design & Engineering Plan Sets

Texas is experiencing explosive solar growth across both residential neighborhoods and large commercial facilities. Navigating municipal building permits and utility interconnection across Oncor, CenterPoint Energy, AEP Texas, TNMP, and Austin Energy requires precise, code-compliant plan sets.

Your Solar Permit provides rapid 24-48 hour turnaround on complete Texas solar permit plan sets for Houston, Dallas-Fort Worth, Austin, San Antonio, and all Texas municipalities. All plan sets include detailed electrical single-line diagrams, structural attachment calculations, and licensed Texas PE stamping.

ERCOT & TDSP Utility Approved
Houston, DFW, Austin, San Antonio
Licensed Texas PE Stamps
24-48h Expedited Turnaround
Texas Solar Permit Engineering Sets
TEXAS FAQS

Texas Solar Permit FAQs

Key answers regarding Texas solar permit approvals, Oncor & CenterPoint interconnection, and PE stamping.

Our turnaround for Texas residential solar permit plan sets is 24 to 48 hours, with expedited options available for urgent installation timelines.

Many Texas municipalities (such as Houston, San Antonio, and specific DFW cities) require structural calculations and electrical engineering stamped by a licensed Texas PE. We provide full Texas PE structural and electrical stamping.

We engineer plan sets compliant with all Texas utilities and TDSPs, including Oncor Electric Delivery, CenterPoint Energy, AEP Texas, Texas-New Mexico Power (TNMP), Austin Energy, and CPS Energy.