Explore our tailored service options below and choose the ideal plan for your requirements.
Ideal for standard residential rooftop solar installations.
Best suited for large residential or multi-array setups.
Popular because it covers design, city permit, PTO, and if required city structural stamping in one bundle.
Comprehensive packages for high-capacity residential systems.
Popular because it covers design, city permit, PTO, and if required city structural stamping in one bundle.
Residential structural engineering stamp.
Large residential structural engineering stamp.
Residential electrical engineering stamp.
Large residential electrical engineering stamp.
City permit application.
City permit application.
PTO / NEM interconnection application.
PTO / NEM interconnection application.
California is the nation's leading solar market, requiring strict compliance with California Title 24 Part 6 energy codes, NEM 3.0 battery storage integration, and specific municipal AHJ requirements across Southern and Northern California.
At Your Solar Permit, we deliver AHJ-ready residential and commercial solar permit plan sets with rapid 24-48 hour turnarounds. We engineer plans for all major California utilities including SCE, PG&E, SDG&E, LADWP, and SMUD, fully backed by licensed California Professional Engineer (PE) stamping.
Delivering fast 24-48 hour AHJ first-pass approvals and utility interconnection plan sets across every major county, city, and utility in California.
Complete engineering plan sets drafted to strict local AHJ codes across Greater Los Angeles, San Diego, and the Inland Empire.
Specialized residential & commercial plan sets for high-density jurisdictions with aggressive clean energy and microgrid mandates.
Engineered for large agricultural setups, ground-mount arrays, and heavy summer heat conditions requiring equipment de-rating calculations.
Engineered for coastal high wind exposure, corrosive marine environments, and strict environmental aesthetics.
Our California engineers guarantee 100% AHJ compliance with 24-48 hour turnaround across all 58 counties.
Frequently asked questions regarding Title 24, NEM 3.0 battery storage, and California AHJ approvals.