TEXAS JURISDICTION SPECIALISTS

Texas Solar Permit Plan Sets & P.E. Stamps

Fast 24-48 hour turnaround for code-compliant solar plan sets tailored to local Texas AHJs, ERCOT grid rules, ASCE 7-16 high wind load criteria (up to 150 mph), and Oncor / CenterPoint / AEP utility requirements.

01 / WIND LOADS

ASCE 7-16 Texas Wind Load Calculations

Structural engineering evaluations accounting for Texas wind zones (130-150 mph 3-second gusts), rafter attachment spacing, and hurricane-region roof uplift calculations.

02 / INTERCONNECTION

ERCOT Grid & Utility Interconnection

Utility-ready single-line electrical schematics, AC disconnect placement, and interconnection documentation for CenterPoint Energy, Oncor, Austin Energy, and CPS Energy.

03 / STAMPS

Texas Licensed P.E. Stamps

Certified Texas Professional Engineer (P.E.) structural and electrical seals accepted by building departments across Houston, Dallas-Fort Worth, Austin, San Antonio, and statewide.

04 / COMMERCIAL

Texas Commercial & Carport Engineering

3-Phase electrical schematics, transformer capacity audits, and structural foundation designs for commercial rooftop and ground-mount arrays.

Need a Texas Solar Permit Plan Set Delivered Tomorrow?