Solar Permit Requirements
by State — 2026 Edition

NEC code adoption, P.E. stamp mandates, interconnection program, and plan check complexity for every U.S. state. Updated August 2026. This 2026 edition summarizes the state-by-state requirements.

State P.E. Stamp NEC Version Adopted Interconnection Program Plan Check Complexity Notable Requirement
California (CA)REQUIREDNEC 2022NEM / Net Billing Tariff⭐⭐⭐⭐⭐ Very HighTitle 24 mandate, rapid shutdown NEC 2022, NFPA 855 battery limits
Texas (TX)REQUIREDNEC 2020ERCOT / TDSP Filing⭐⭐⭐⭐ HighP.E. stamp required for systems >10kW; no statewide solar mandate
Florida (FL)REQUIREDNEC 2020FPL / Duke Net Metering⭐⭐⭐⭐ HighHurricane wind zone compliance (ASCE 7 Exposure D common)
New York (NY)REQUIREDNEC 2020Con Edison / NYSERDA⭐⭐⭐⭐ HighNYC Dept of Buildings requires licensed PE stamp on all commercial
Arizona (AZ)VARIESNEC 2017APS / SRP Net Metering⭐⭐⭐ MediumMaricopa County AHJ requires PE for ground-mount; residential varies
Colorado (CO)VARIESNEC 2020Xcel Energy REC⭐⭐⭐ MediumSnow load calculations critical (Pg up to 50 psf in mountain areas)
Nevada (NV)REQUIREDNEC 2020NV Energy Net Metering⭐⭐⭐ MediumPE stamp required for commercial; high ambient temps affect derating
Oregon (OR)VARIESNEC 2020PGE / Pacific Power⭐⭐⭐ MediumSeismic zone considerations for ground-mount in some counties
Washington (WA)VARIESNEC 2020PSE / PUD Net Metering⭐⭐⭐ MediumSnow load (Pg) critical for flat roofs in Eastern WA
New Jersey (NJ)REQUIREDNEC 2017JCP&L / PSE&G Net Metering⭐⭐⭐⭐ HighNJ Board of Examiners requires PE for commercial and multi-family
Massachusetts (MA)REQUIREDNEC 2020Eversource / National Grid⭐⭐⭐⭐ High780 CMR building code; snow loads critical statewide (Pg 25-40 psf)
Georgia (GA)NOT REQUIREDNEC 2020Georgia Power Net Metering⭐⭐ LowResidential typically no PE; commercial >50kW requires engineer
North Carolina (NC)NOT REQUIREDNEC 2020Duke Energy Net Metering⭐⭐ LowResidential no PE required; expedited permit programs in many AHJs
Hawaii (HI)REQUIREDNEC 2020HECO Smart Export⭐⭐⭐⭐ HighHurricane zone uplift (Exposure D); HECO interconnection very strict
Illinois (IL)VARIESNEC 2017ComEd / Ameren Illinois⭐⭐⭐ MediumChicago requires PE stamp; suburban counties vary significantly
Ohio (OH)NOT REQUIREDNEC 2017AEP / FirstEnergy Net Metering⭐⭐ LowResidential no PE; township-level AHJ variation common
Pennsylvania (PA)REQUIREDNEC 2017PECO / PPL Net Metering⭐⭐⭐ MediumPE required for commercial; PA DEP Act 129 energy efficiency mandates
Virginia (VA)NOT REQUIREDNEC 2020Dominion Energy Net Metering⭐⭐ LowResidential simplified permit in most counties; commercial PE recommended
Michigan (MI)VARIESNEC 2017DTE / Consumers Energy Net Metering⭐⭐⭐ MediumDetroit and major cities require PE; rural areas vary
Minnesota (MN)NOT REQUIREDNEC 2020Xcel Energy / Great Plains⭐⭐⭐ MediumSnow loads critical (Pg 30-50 psf statewide); cold temp derating mandatory
Maryland (MD)REQUIREDNEC 2020BGE / Pepco Net Metering⭐⭐⭐⭐ HighCOMAR regulations require PE for commercial; streamlined residential online
Tennessee (TN)NOT REQUIREDNEC 2017TVA / Local Co-ops⭐⭐ LowTVA Net Metering simplified; no statewide PE mandate for residential
South Carolina (SC)NOT REQUIREDNEC 2017Duke Energy Net Metering⭐⭐ LowHurricane zone in coastal areas; most residential permits standard
Indiana (IN)VARIESNEC 2017AES / Duke Ind. Net Metering⭐⭐⭐ MediumIndianapolis requires PE for commercial rooftop systems
Missouri (MO)NOT REQUIREDNEC 2017Ameren / Evergy Net Metering⭐⭐ LowNo statewide PE mandate; city-level requirements vary
Connecticut (CT)REQUIREDNEC 2020Eversource / UI Net Metering⭐⭐⭐⭐ HighDEEP regulations require PE stamp; strong snow load code enforcement
Rhode Island (RI)REQUIREDNEC 2020National Grid Net Metering⭐⭐⭐⭐ HighSmall state with strict AHJ enforcement; PE required for all systems
Wisconsin (WI)VARIESNEC 2017We Energies / WPS⭐⭐⭐ MediumHeavy snow loads; Milwaukee requires PE for commercial systems
Alabama (AL)NOT REQUIREDNEC 2017Alabama Power Net Metering⭐⭐ LowLimited net metering policy; simplified residential permits
Mississippi (MS)NOT REQUIREDNEC 2017Entergy Mississippi⭐ Very LowLimited solar incentives; basic residential permits in most counties
Louisiana (LA)NOT REQUIREDNEC 2017Entergy Louisiana⭐⭐ LowHurricane exposure critical for coastal parishes; Entergy net metering limited
Arkansas (AR)NOT REQUIREDNEC 2017Entergy / SWEPCO⭐⭐ LowGrowing solar market; limited AHJ enforcement of PE requirements
Oklahoma (OK)NOT REQUIREDNEC 2017OGE / PSO Net Metering⭐⭐ LowTornado/wind zone calculations important for ground-mount systems
Kansas (KS)NOT REQUIREDNEC 2017Evergy Net Metering⭐⭐ LowWind zone calculations important; standard residential permit process
Nebraska (NE)NOT REQUIREDNEC 2017LES / NPPD Net Metering⭐⭐ LowSnow loads moderate; limited solar policy vs. wind energy focus
Iowa (IA)NOT REQUIREDNEC 2017MidAmerican / Alliant⭐⭐ LowSimplified permits; snow and wind loads critical for ground-mount
South Dakota (SD)NOT REQUIREDNEC 2017Northwestern Energy⭐⭐ LowHeavy snow loads (Pg 30-50 psf); standard residential permit process
North Dakota (ND)NOT REQUIREDNEC 2017Otter Tail / MDU⭐⭐ LowExtreme snow loads and cold temps require careful conductor derating
Montana (MT)NOT REQUIREDNEC 2017Northwestern Energy⭐⭐ LowMountain zone snow loads critical; NorthWestern Energy net metering
Wyoming (WY)VARIESNEC 2017Rocky Mountain Power⭐⭐ LowWind zone Exposure C/D critical at high elevations
Idaho (ID)NOT REQUIREDNEC 2017Idaho Power Net Metering⭐⭐ LowSimplified residential permit; seismic zone 2-3 consideration for ground-mount
Utah (UT)VARIESNEC 2017Rocky Mountain Power⭐⭐⭐ MediumSalt Lake City requires PE for commercial; residential varies by county
New Mexico (NM)VARIESNEC 2017PNM / TNMP Net Metering⭐⭐⭐ MediumHigh UV index and heat; Albuquerque requires PE for commercial systems
Alaska (AK)VARIESNEC 2017AEA / GVEAs⭐⭐⭐ MediumExtreme cold temps require aggressive conductor derating; snow loads critical
Vermont (VT)VARIESNEC 2020Green Mountain Power⭐⭐⭐ MediumNet metering popular; heavy snow loads (Pg 40-60 psf) critical
New Hampshire (NH)VARIESNEC 2017Eversource / Liberty⭐⭐⭐ MediumSnow loads critical (Pg 40-60 psf); PE often required for steep-slope roofs
Maine (ME)REQUIREDNEC 2017Central Maine Power⭐⭐⭐ MediumPE stamp required for systems >25kW; snow loads critical in northern ME
Delaware (DE)NOT REQUIREDNEC 2017Delmarva / DelDOT Solar⭐⭐ LowSmall state; simplified online permit portal for residential
West Virginia (WV)VARIESNEC 2017Appalachian Power⭐⭐ LowLimited solar adoption; county-level AHJ variance common
Kentucky (KY)VARIESNEC 2017LG&E / Kentucky Utilities⭐⭐ LowLouisville Metro requires PE for commercial; most counties simplified

We Serve All 50 States — Permit-Ready in 24-48 Hours